yastero
All updates
v0.1.0-alpha.56Planner · Alpha milestone

Build an addition and estimate materials from real wall bodies

Review a new room beside your house, reuse its shared wall, and edit openings, construction layers and product coverage inside the real-wall workspace.

Open real-wall tools
Two connected rooms in the real-wall editor with one shared wallView larger
An addition reuses the physical shared wall instead of drawing it twice.Development screenshot ·

Native geometry with a review

Create geometry accepts feet and inches or millimeters. A new rectangular room can share all or part of an existing wall without adding a coincident wall. Conflicting shared dimensions and overlapping room interiors are rejected.

Before accepting geometry changes, compare saved and proposed room, wall, opening, object, roof and material-estimate counts plus clear floor area. Download the saved revision, keep it, or accept and use Undo. Removing a room keeps shared walls and removes its own unshared contents. At least one room remains.

Opening tools distinguish a through-void, installed door or window, and partial-depth wall niche. Measurements must fit the physical host and avoid overlapping cuts or unsupported joints. They do not specify a product rough opening.

Measurements with an explicit basis

Construction layers declare their role, thickness, measurement basis, product/source and unresolved requirements. Unknown thicknesses keep dependent component envelopes unresolved. Shared assemblies are copied before editing one wall.

Joint priority controls overlapping component envelopes at an actual wall encounter; its system revision and unresolved design requirements remain visible. This is not structural approval or a framing/fixing schedule.

Material estimates use clear floor or exposed interior wall faces, round package counts once across chosen rooms, and show allowance and optional USD price. A missing coverage source leaves the purchase quantity pending. Returns, ends, caps and stair floor apertures remain separate scope.

The real-wall workspace remains available through the opt-in editor while the final activation matrix is completed.

A closer look

Saved and proposed building counts and floor area before accepting an additionView larger
Review the affected scope before saving a geometry change.Development screenshot ·
Native wall construction layers showing thickness, source and unresolved design requirementsView larger
Layer envelopes retain their measurement basis and pending specification.Development screenshot ·
Narrow-screen material list with a floor pictogram, package count, cost and coverage traceView larger
A readable estimate keeps source and measured scope alongside the quantity.Development screenshot ·

This milestone was documented on October 25, 2026 and added to the public history on October 25, 2026 at 7:43 AM GMT-3. Screenshots show the development state at the time. About this alpha history.

Development screenshot